
In 30 Seconds
- With 25.5 GW of solar installed, Gujarat expects a growing pile of discarded panels, and its recycling system is not ready yet.
- Gujarat is facing a new kind of waste problem.
- Gujarat had 25.5 GW of installed solar capacity as of December 2025, which puts it among India's biggest solar markets.
Gujarat is facing a new kind of waste problem. As the state adds solar power at speed, it is also building up a stream of old and broken solar panels. The state is projected to produce 11,528 tonnes of solar photovoltaic waste by 2030.
Gujarat had 25.5 GW of installed solar capacity as of December 2025, which puts it among India's biggest solar markets. Panels usually last 25 to 30 years. But many fail much earlier, due to factory defects, rough handling during transport, poor installation and storms.
Panels hold materials that can be recovered and reused, including silicon, silver, copper, aluminium and glass. Solar consultant Jaideep Malaviya said recovering these materials could create a secondary raw material market and cut reliance on new mining. The state's recycling system, however, is not yet equipped for the expected volumes.
A July 2026 report from the Gujarat Rajya Institution for Transformation (GRIT) points to gaps in collection, recycling technology, digital tracking and financial incentives. Stakeholders told the report there are no dedicated collection centres. Much of the waste from scattered rooftop systems ends up with informal scrap dealers.
The problem reaches well beyond Gujarat. GRIT estimates India's cumulative solar waste at about 100 kilotonnes in FY2023. That could rise to 340 kilotonnes by 2030 and around 19,000 kilotonnes by 2050. Gujarat, Rajasthan, Karnataka, Tamil Nadu and Andhra Pradesh are expected to account for about 67% of the 2030 volume.
Some companies are trying to stretch the life of older panels first. Engineering and construction firms in South Gujarat are moving used panels from high-demand sites to places with lower power needs and more space. Damaged panels are being sent back to manufacturers for recycling.
Surat Municipal Corporation has offered incentives, including leased land, for waste recycling projects. Some players are in talks to build facilities, and recycling machinery is already on the market. Still, there are no clear rules for handling solar plant waste, and India currently has only one recycling plant, in Chennai. Gujarat must build collection and processing systems before its first large wave of retired panels arrives.
Read the original reporting at Times of India.